Philippines: 'Build Build Build' program by Joseph Dacalanio
The construction of Skyway 3 is intended to connect South Luzon Expressway (SLEX) at Alabang to Balintawak in Quezon City before North Luzon Expressway (NLEX) through Central Metro Manila. The project is a 14.82 km. 6-lane elevated toll road and the last of three (3) stages of Metro Manila Skyway (MMS) System. This is a part of the Build Build Build program under Duterte government.
You must be logged in to use lightbox functionality