Indonesia: Power failures by Kuncoro Widyo Rumpoko
Due to a disturbance in the 500 kV Ungaran and Pemalang transmission, electricity was cut off in a number of areas on the island of Java, Indonesia today Sunday, 04/08/2019 around 11.48 Western Indonesia Time. This makes the energy transfer from east to west fail and is followed by all power plant trips on the central and western sides of Java. In addition, there was a disturbance in the 500 kV SUTET (Extra High Voltage Air Line) power transmission which resulted in power outages in some areas of West Java.
Due to a disturbance in the 500 kV Ungaran and Pemalang transmission, electricity was cut off in a number of areas on the island of Java, Indonesia today Sunday, 04/08/2019 around 11.48 Western Indonesia Time. This makes the energy transfer from east to west fail and is followed by all power plant trips on the central and western sides of Java. In addition, there was a disturbance in the 500 kV SUTET (Extra High Voltage Air Line) power transmission which resulted in power outages in some areas of West Java.
You must be logged in to use lightbox functionality